| Subdivision development |
Water and fire mains |
Sep 2014 |
SASHA |
| Subdivision development |
Water and fire mains |
May 2015 |
Pillar & Strong |
| Subdivision development |
Water and fire mains |
Nov 2015 |
Level Construction |
| Knollwood Rd, Resurfacing, Durham, NC |
4″ Overlay Paving, Base Repair, Culvert Installation, Shoulders Concrete Curb & Gutter |
Dec 2015 |
City of Durham |
| Knox &lredalle Roadway Repair Durham, NC |
Watermain Break Repair, Roadway Repair, Concrete Curb & Gutter, Shoring |
Dec 2015 |
City of Durham |
| Holloway Road Repair Durham.NC |
Roadway Reconstruction, Water and Sewer, Concrete Culvert, Curb & Gutter, Shoring, Traffic Control Detour |
Jan 2016 |
City of Durham |
| Comfort Suites |
Water, sewer, storm and Fire mains for the project |
Oct 2017 |
Clean Harbors Envonmental |
| US-1 Culvert Cleanout and Assessment Youngsville, NC |
Permits & Full Entry Approvals Right of Way Assessment, Failed Culvert 60″, Cleanout using mechanical means, Rip Rap, Erosion Control |
Oct 2018 |
North Carolina Dept of Transportation |
| Multi street utility installation |
Full sub contracts for the installation of all water, and sewer mains |
Oct 2018 |
CES Utilities |
| William White Road Pilot, NC Franklin County |
Crossline Pipe Repair, Joint Reset and Replacement AST Resurfacing, |
Oct 2018 |
NCDOT |
| Clyde Pearce Road Youngsville, NC |
Crossline Repair, Joint Reset and Replacement, and Permits AST Resurfacing |
Oct 2018 |
NCDOT |
| Conroe Water line extension project, Conroe |
Install 6” TS&V and run 700 ft of 6” water line including all valves and fittings |
Oct 2018 |
Anthony Drywall |
| Emerald Woods Subdivision Youngsville, NC |
Row Permit Access Engineering Assessment, Installation of Roadway, Pipe Culvert Clearing and Grubbing, & 12” Watermain |
Nov 2018 |
Pallentine Development, Wake Forest, NC |
| Jensen St Project, Houston |
Install 2 Ea 8 ft manhole; bore and install 8” sewer line |
Nov 2018 |
Villa Capri Developments |
| Multi street utility installation |
Full subcontracts for the installation of water mains |
Mar 2019 |
Brock Construction |
| Hotel Project, Houston |
Install 1600 ft of water line, sewer line and fire lines |
Apr 2019 |
TDK construction |
| City of Conroe |
Installation of fire lines for commercial development |
Aug 2019 |
Atlas Fire |
| Wainwright St project, Houston |
Install 8”x6” TSV and run 180 ft of fire line |
Jan 2020 |
Advantage fire |
| Kilgore St Project, Houston |
Sewer taps, install manholes, 24×24 inlets, Junction box |
Jan 2020 |
Higher Ground Construction |
| Calm Feather Dr project, Houston |
Install 8”X6” TS&V and run 150 ft of 6”line |
Mar 2020 |
Advantage Fire |
| Crosby Fire lines, Houston |
Install 480 lf of fire main and set 1 fire hydrant |
May 2020 |
Advantage Fire |
| Master Services contract |
Installation of multiple runs of fire and water lines, ranging from 6” to 16” mains |
May 2020 |
Advantage Fire |
| Burnett Ave Electrical Duct bank, Houston |
Installed a 6” size 12 conduit electrical duct bank at medical center |
June 2021 |
Unicorn contractors |